Calibrated for 2024–2026 Loaded rates

THE OUTAGE MANAGEMENT & INTELLIGENCE SYSTEM FOR Shutdown Management

A complete Outage Management System bridging budget estimations, real-time workscope updates, and team collaboration. Replace fragmented spreadsheets, secure loaded labor rates, and break communication barriers across all refinery turnaround crafts.

goisplatform.com/portal
GOIS Standalone Dashboard Banner UI Screen
AACE Class 3/4/5 Bounds
Serverless SharePoint Sync

Calibrated B2B Estimating Capabilities

Designed specifically for downstream petrochemical refining complexes, GOIS isolates contractor worksheets, computes geometries, and logs revisions.

Volumetric Geometry Estimator

Translate physical storage tank geometries (Diameter, Height, Sludge Depth) directly into surface areas and capacities. The parametric cost engine scales waste disposal tons, cleaning durations, and mechanical repair labor-hours.

Sim-Role Contractor Isolation

Maintain absolute trade secret rate security. Distribute isolated URL token logins for inspection, scaffolding, coating, and mechanical crews. Contract crews can log execution progress (0%–100%) while loaded unit billing rates remain locked behind padlocks 🔒.

AACE Class Limits

Guide funding approvals with immediate statistical risk bands. GOIS classifies outage scopes into Class 3 Funding (±15% to -20%), Class 4, or Class 5, auto-calculated according to AACE parameters.

Immutable Revision Ledger

Ensure audit defensibility. Calculations are blocked upon delta quantity or rate updates until a valid Reason Code (Scope Growth, Field Condition, Rate Change) is logged in an unalterable revision history.

Serverless Directory Sync

Deploy instantly with zero cloud server setup. GOIS packages into a single, offline-capable portable HTML file that synchronizes state via linked local folders (SharePoint/OneDrive/ShareFile).

Zero-Server B2B Operations

Refineries require ironclad data security. Learn how the GOIS file-syncing and engineering pipeline functions without exposed web database stacks.

GOIS Refinery Cost Estimation Logic Flow Diagram
Engineering Cost Calibration Logic Flow
GOIS OneDrive/SharePoint Collaborative Sync Diagram
Serverless Collaborative Synchronization Pipeline

Breaking Down B2B Communication Silos

A successful turnaround requires complete alignment. GOIS unifies owners, engineers, subcontractors, safety watches, and leadership into a single transparent workflow.

The Collaborative Outage Lifecycle

From initial engineering assumptions to field mechanical execution and executive alignment.

1

Budget Estimations & Baseline Staging

Refinery owners calibrate physical equipment dimensions and load region-specific burdened billing rates to lock an audit-defensible baseline budget.

2

Real-Time Workscope Status Updates

Crews log in via isolated secure Sim-Role URL tokens. Scaffolders log volume units, combo/exotic welders slide repair progress percentages, and API inspectors approve welds in real-time.

3

Variance Oversight & Executive Control

Every single scope change prompts a mandatory Reason Code, updating the SVG cost donut rollup, AACE Class accuracy meters, and dynamic contingency variance indicators instantly.

Integrated Turnaround Crafts

Hover or select a role tag to inspect how GOIS bridges communication silos and enhances team coordination.

Owner / Estimator (Full Admin)

Establishes secure, audit-defensible baseline budgets using integrated volumetric equations. Calibrates local corridors and loaded billing rates, setting strict contingency limits before turnarounds commence.

🔓 SILO BUSTER ADVANTAGE: Saves hours in estimating, prevents contractor rate leakage via secure locks 🔒, and eliminates spreadsheet formula manipulation.

Interactive Pricing & PO Simulator

Select your refinery footprint parameters to generate an instant B2B subscription quote under standard corporate purchase order Net-30 terms.

1 Complex
1
15 Turnaround Days
15d
Local (<50 mi)
Regional (>50 mi)
Gulf Corridor
Class 3 (±15%)
Class 4 (±25%)
Class 5 (±40%)
QUOTE NO: GOIS-2026-Q879
DATE: JUNE 1, 2026
EXPIRES: NET-30 DAYS
PREPARED FOR:
Refinery Procurement Director
Gulf Coast Turnaround Services
BILLING METHOD:
Net-30 Corporate PO
Corridor Staging Active
Item / Deployment Description Price per Site Total Net
GOIS Site License Core
1 Complex Staging Deployments
$50,000.00 $50,000.00
Standard Licensing Total: $50,000.00
PO Taxes & B2B Setup: $0.00 (Waived)
Annual PO Total: $50,000.00
Estimated Outage Waste Savings: $28,800/yr
Prevents standard spreadsheet 2.4% cost overruns.

Deploy GOIS on Your SharePoint Directory

Active refinery complexes are staged within 24 hours. The engineering deployment contains custom regional labor tables, API inspection packages, and historical calibration points standard to your refinery corridors.

B2B Procurement Inquiries
procurement@goisplatform.com
Gulf Coast Coverage
Baton Rouge Corridor / Houston Ship Channel
Proposal copied successfully!